Port Apapa Lagos, Nigeria
Rehabilitation of a multi purpose terminal

Port Apapa Lagos

 

Client:
Sealand Limited, London

Construction Costs:
ca. 19 Mio. $

Services:
Master Plan; Preliminary Design, Final Design and Tender Documents

Period:
2007 - 2008

It is intended to construct a new quay wall and terminal area with a raw sugar factory at Port Apapa, Lagos / Nigeria. The project comprises the construction of approximately 245 m of quay wall fully equipped to accommodate large bulk carriers, general cargo vessels and container vessels, moreover dredging of an area of approximately 245 × 60 m large rectangle to a depth of CD 12.5 m. The handling of cargo will be done by two mobile harbour cranes and a conveyor belt system. The terminal area will be designed for the harbour operations with a heavy duty pavement. Additionally two gates and an office were foreseen within the dedicated port area.

Sellhorn prepared the following topics:

  • Definition of the design basis
  • Static review of the existing quay construction
  • Demolition works
  • Layout of the new terminal
  • Construction and static calculation of the new quay wall
  • Design of media supply (hydraulic calculation etc.)
  • Design of main gates and office buildings.

The listed works were prepared for the following design phases:

  • Concept Design
  • Permission Design
  • Final Design
  • Tender Documents.